Saturday, October 25, 2008

WAPA and generator power is down on St. Croix

Office of the CIO

October 22, 2008

The current status on the St. Croix campus is: WAPA is down and the St. Croix backup generator power is also down. Therefore, all technology services are down. Thank you.

No comments: